An airport is the worst place to guess.

Thousands of people land at once, switch their phones off flight mode, and try to message family, book a taxi and upload photos in the same few minutes. If the network can't take that surge, the first impression a visitor gets of the country is "No Service".

At Mobitel I work on capacity planning and IBS/DAS design for Bandaranaike International Airport (BIA), Katunayake. BIA handled about 10.2 million passenger movements in 2025 and about 4.75 million in the first half of 2026 (Daily FT). Here is the method I use, and what makes airports different from almost any other site.

1. Plan for the peak hour, not the average day

Ten million passengers a year sounds like 28,000 a day. That number is useless for radio design. Airport traffic arrives in waves set by the flight schedule, so the real question is: how many active users are inside a given zone during its busiest 15 to 60 minutes?

I build that from three inputs:

A worked example (illustrative numbers, not BIA's actual design figures):

Input Value
Wide-body arrivals landing within 30 minutes 3
Passengers per flight 300
People in baggage claim at the peak ~900
Share with an active data session 40%
Active users to serve in that zone ~360

That single zone can need more capacity than a whole suburban cell site. A busy hall can also be quiet ten minutes later, so capacity has to move with the crowd.

2. Split the building into capacity zones

An airport isn't one cell. I divide it into zones that behave differently:

Each zone gets its own sector or cell group, so a surge at arrivals doesn't starve the gates.

3. Choose bands and MIMO by role

Different LTE layers do different jobs:

The skill is matching configuration to the zone. 8T8R in a back-office corridor is wasted money; 2T2R at a crowded gate cluster is a complaint waiting to happen.

4. Control the boundary with the outdoor network

The hardest part of in-building design is often the edge. Outdoor macro cells leak into terminals through glass walls, and indoor cells leak out onto aprons and car parks. Without careful planning, phones ping-pong between indoor and outdoor cells and calls drop at the doors.

What helps:

5. Optimisation never ends

Flight schedules change every season. New airlines arrive, terminals expand and passenger habits shift towards more video. Airport IBS is a living system. I track KPIs by zone and by hour, especially accessibility, drop rate, throughput per user and PRB utilisation, and adjust capacity before users feel the congestion.

What I'd tell any RF engineer starting on a venue like this

  1. Start from people, not square metres. Passenger flow is the real input.
  2. Design for the peak 15 minutes, and know which zone it happens in.
  3. Treat the indoor–outdoor boundary as its own design problem.
  4. Build monitoring in from day one. A venue changes faster than a city.

Airports show that radio planning is really demand planning. The physics matters, but the passengers write the requirements.